Clarkson Projects
With a highly skilled project team, Clarkson Electrical can undertake high quality turn-key Electrical Contracts plus Design & Builds which can include:
| Auto CADD Drawings |
Scoping work with Engineers, Architects and suppliers |
| Electrical Consulting |
Electrical Installation |
| Electrical Commisioning Inspection |
Procurement of Electrical Materials, Supplies and Labour |
| Design and Drawing Work |
|
We have successful completed on time and within budget large-scale electrical projects ranging up to $3.5 million in value, utilizing our own electrical staff and contractors. These projects have been in the Commercial, Industrial, and Hazardous Areas.
We undertake quality-critical turn-key electrical contracts from preliminary discussions with engineers, architects and suppliers through design, drawing and permits and finally to electrical installation and commissioning.  
Examples of the work we have completed include:
| Client |
Project |
Approximate Value |
| Iron Mountain |
Design and Build: Wire new warehouses, office block and destructor areas. Install lighting and power in new racking warehouse 2. |
900k |
| Watercare Nihotupo Dam |
Upgrade Controls and Install new Switchboards, ladder Rack and Cabling. |
130k |
| Watercare Admore Filter Station |
Control Centre and Office upgrade. Refit offices at admore filter stations |
50k |
| VTNZ |
Design and Build: Wire new Vehicle Testing station |
80k |
| Nufarm |
Design and Build new motor control centre. Connect PLC Controls, connect new plants. |
600k |
| Easy Logostics |
Wire new Coolstore |
250k |
| Emerson Buildings |
Manufacture control panels and install equiptment to remote monitor and control Mobil service stations |
400k |
| Mobil Smales Road |
Wire new service station |
320k |
| Metrowater |
Screening Plants install switchboards and connect screening plants at different locations |
115k |
| Shell Kaikohe |
Wire New Service Station |
115k |
| Supreme Steel |
Mains and Switchboard Upgrade and connect new furnace |
85k |
| Crown Documents Storage |
Wire New Warehouse and Office Block and Install Lighting in Racking |
260k | << Back
|